Q14.
|
I want to edit the report templates in SM-Reports, and maybe make my own. Where can I learn how the templates are put together?
|
Q13.
|
Is SM-Reports is able to
calculate an Overall Achivement letter for the new reports. If it can,
how can I do this?
|
Q12.
|
Are there sample reports
that show
some different possible styles of report?
|
Q11.
|
When
I
try to run the SM-Reports Work File program or run Setup.exe to install
it on computer, I get this message (or similar) "16-bit MS-DOS
Subsystem path to the program that you are trying to start or install
C:\Windows\System32\Autoexec.nt The system file is not suitable for
running MS DOS and Microsoft Windows applications." How can I fix this?
|
Q10.
|
Is
there a concise guide
to
using SM-Reports?
|
Q9.
|
Can
more than one
supervisor work in SM-Reports
at the same time?
|
Q8.
|
When
I print a report,
the
expected information is not appearing, how do I fix this?
|
Q7.
|
How
long is required to
produce a set of
reports?
|
Q6.
|
I
get an unexpected
message
about the database being locked, how can I open the database?
|
Q5.
|
Can
I import the current
timetable data from my
timetable program into SM-Reports?
|
Q4.
|
Can
SM-Reports be
networked? |
Q3.
|
What
sort of PC is
required to
run
SM-Reports? |
Q2.
|
What
is the cost of
getting
report templates done for SM-Reports?
|
Q1.
|
Does
the trial program
do
everything that the full licensed copy can do? |