SM-Reports

Support
QA
Ordering
About Us
Back

Below is a list of questions that have been asked about SM-Reports. Click on the number on the left of the question to show the answer. If your question is not listed here you can submit it from the Support page. These are sorted in reverse order so the more recent questions are at the top of the table.

Q14.
I want to edit the report templates in SM-Reports, and maybe make my own. Where can I learn how the templates are put together?
Q13.
Is SM-Reports is able to calculate an Overall Achivement letter for the new reports. If it can, how can I do this?
Q12.
Are there sample reports that show some different possible styles of report?
Q11.
When I try to run the SM-Reports Work File program or run Setup.exe to install it on computer, I get this message (or similar) "16-bit MS-DOS Subsystem path to the program that you are trying to start or install C:\Windows\System32\Autoexec.nt The system file is not suitable for running MS DOS and Microsoft Windows applications." How can I fix this?
Q10.
Is there a concise guide to using SM-Reports?
Q9.
Can more than one supervisor work in SM-Reports at the same time?
Q8.
When I print a report, the expected information is not appearing, how do I fix this?
Q7.
How long is required to produce a set of reports?
Q6.
I get an unexpected message about the database being locked, how can I open the database?
Q5.
Can I import the current timetable data from my timetable program into SM-Reports?
Q4.
Can SM-Reports be networked?
Q3.
What sort of PC is required to run SM-Reports?
Q2.
What is the cost of getting report templates done for SM-Reports?
Q1.
Does the trial program do everything that the full licensed copy can do?


Copyright 2008, SMPCS